FROM THE CONSERVATOR’S CHRONICLE. CONSTRUCTION AND CONSERVATION WORKS IN THE SECTION KNOWN AS THE WEST WING OF KRZYSZTOFORY PALACE AT 35 MAIN MARKET SQUARE IN KRAKOWBETWEEN 2011 AND 2012

Krzysztofory Palace, the main seat of the Historical Museum of the City of Krakow, acquired its final form in the course of several construction stages consisting in the annexation of neighbouring buildings to the medieval house on the Main Market Square known as kamienica Morsztynowska. In 1644, Adam Kazanowski, Court Marshal of the Crown, purchased the house on the northern side of Szczepańska Street that had been property of Jan Chmielowski, a merchant – hence its designation as kamienica Chmielowska in the reference literature. This part of the complex was brought to its ultimate architectural and functional layout by its subsequent owner, Jan Wawrzyniec Wodzicki, an administrator of salt mines in Wieliczka and Bochnia; the work was supervised by Italian constructor Giacomo Solari. The impressive edifice of that residence of magnates was laid out on an U-shaped plan. The westernmost section of the building, highlighted by a gate with passage into the courtyard (4 Szczepańska Street), is currently known as the “west wing”. The work on modernizing the palace, which actually commenced only in 2007 due to logistic and property issues, was basically concerned with the part of the complex surrounding the courtyard from the west; it was not until the building at 4 Jagiellońska Street was officially put into use that the office facilities of Cricoteka in the basement and on the bottom storey of the west wing could have been removed to that new location. As a consequence, the construction and conservation work continued until June 2012; it was carried out by DeS Henryk Dowgier, Anna Dowgier sp.j. with Jacek Pierzak as the supervising archaeologist and under conservator’s and architectural supervision by Cempla i Partnerzy Konserwacja Zabytkow Marek Jozef Cempla. The construction project comprised the reinforcement of foundations; vertical DPC; the structural reinforcement of the staircase with the replacement of terrazzo stairs; the removal of secondary partitions and walledin sections, window and door frames, and stoves earmarked for relocation; the clearing of flues; the reinforcement of lintels; the removal of the fill from vaults; the reinforcement of roof truss; and the replacement of window frames with new ones, which are patterned after their historic counterparts. The conservator’s survey did not reveal any layers of polychromes that would qualify for exposition. Carried out in combination with archaeological survey in the cellars dating from about the middle of the fourteenth century, and especially in the chamber parallel to the Szczepańska, architectural research proved to be contributory to learning about the history and transformations of this part of the complex. The research consisted in unearthing the medieval descent from the street into the basement with an ogival stone portal, which reflects gradual modifications of the level of the actual usable surface in Krakow; the chamber could not be exposed due to secondary partitions inside it. It was an archaeological sensation to discover an ashlar container in the east section of the chamber, under the present-day entrance into the courtyard from the Szczepańska. It is an oval structure that resembles a tapered well casing with rounded corners, built into a rectangular cellar. Based on the dendrochronological analysis of the relics of wooden joists preserved at the bottom of the container, it has been established with a certain dose of probability that the structure was built at the turn of the seventeenth and eighteenth centuries. It could have been used to store slabs of ice (an ice house?), or beverages for the magnate’s fare. The container does not have its equivalents in Krakow and will constitute a special feature of the forthcoming permanent exhibition centred around the history and culture of Krakow. Subsidized with funds from the Małopolska Regional Operational Programme, the project has been launched in 2013 and is due to be completed in the middle of 2014.

Pobrania

Wersja elektroniczna opublikowana

16.11.2026

Numer

Dział

Artykuły

Jak cytować

Zań-Ograbek, G. (2026). Kronika konserwatorska. Prace budowlano-konserwatorskie w skrzydle zachodnim pałacu Pod Krzysztofory w Rynku Głównym 35 w latach 2011–2012. Krzysztofory. Zeszyty Naukowe Muzeum Historycznego Miasta Krakowa, 31, 321-326. https://doi.org/10.32030/KRZY.2013.20